Sierra Nevada Corporation

Location

Dayton

,

Ohio

Size

100,902 SF

Type

Industrial
Arrow Outward

This hangar project is the second hangar making up SNC’s operations at Dayton International Airport. The hangar, comprised of 300′ clear spans in both directions with over 70′ clear height, enables SNC to perform maintenance, repairs, and operations on multiple aircraft. In total, the hangar includes over 10,000 square feet of office and storage areas, as well as 90,000 square feet of hangar space. The hangar can house both a C-17 and Boeing 767 simultaneously.

Client

Sierra Nevada Corporation (SNC)

Year

2024 (Under Construction)